STRUCTURE
Reinforced Concrete Collumns & Beams
WALLS
Cement Bricks
ROOFING TILES
Cement roofing tiles
ROOF TRUSSES
Steel Trusses
CEILING
Ground Floor
Living & dining: Skim Coat
Others: Cement plaster and paint
First Floor
Plaster ceiling
WINDOWS
Aluminium casement window and /or fixed/adjustable glass louvres & fixed glass louvres
WINDOW FRAMES
Aluminium window frames
DOORS
- Decorative door for main door
- Flush doors for others
- PVC doors for bathrooms / toilets
DOOR FRAMES
Galvanised steel frames
LOCKS
Quality cylindrical / Lever lock sets
FLOOR FINISHES
Ground Floor
Living, dining, kitchen & bathrooms: Ceramic tiles
First Floor
Living, bedrooms & bathrooms : Ceramic tiles
Staircase: Ceramic tiles
WALL FINISHES
Kitchen, bathrooms & toilets: Wall tiles approximately 5’0″ high
* Type & colour of tiles are subject to availability
PAINTWORKS
External & Internal Plastered Wall : Quality emulsion paint
ELECTRICAL INSTALLATION
Ground Floor
|
Plt 13-44 |
Plt 45-74 |
Ceiling light point |
09 |
09 |
Wall light point |
02 |
02 |
Ceiling fan point with hook |
02 |
02 |
13amps power point |
09 |
09 |
Auto gate point |
01 |
01 |
TV/ASTRO point |
01 |
01 |
2 way switch point |
01 |
01 |
Telephone point |
01 |
01 |
Water heater point |
01 |
01 |
Air con point |
01 |
01 |
First Floor
|
Plt 13-44 |
Plt 45-74 |
Ceiling light point |
10 |
06 |
Ceiling fan point with hook |
04 |
04 |
13amps power point |
09 |
09 |
TV/ASTRO point |
01 |
01 |
2 way switch point |
01 |
01 |
Telephone point |
01 |
01 |
Air con point |
01 |
01 |
Water heater point |
03 |
02 |
Wall light point |
- |
05 |
SANITARY & PLUMBING FITTINGS
Pedestal W.C. |
4 |
Wash Basins With Taps |
4 |
Showers |
4 |
Kitchen sink with tap |
1 |
FENCING
Combination of brick wall with metal grill and/or chain link fencing