STRUCTURE
Reinforced concrete columns and beams
WALLS
Cement bricks & metal deck
ROOFING
Metal deck roofing
ROOF TRUSSES
Steel structure
CEILING
Cement plastered finish for ground floor
Plaster ceiling for office area
WINDOWS
Aluminium frame casement window, fixed glass louvres and fixed glass panel
WINDOW FRAMES
Aluminium window frames
DOORS
- Mild steel roller shutters for factory door
- Aluminium frame glass door for main entrance
- Flush door for others
- Steel doors for back exit
- PVC doors for toilets
LOCKS
Quality cylindrical / Lever lock sets
FLOOR FINISHES
Ground & First Floor
Cement screed
Toilets
Ceramic tiles*
WALL FINISHES
Toilets
Wall tiles approximately 5’0″ high*
PAINTWORKS
External Plastered Wall
Quality emulsion paint
Internal Plastered Wall
Quality emulsion paint
ELECTRICAL INSTALLATION
Detached:
Ground Floor
Lighting points : 9
13 Amps power points (3 phase electricity supply available) : 3
First Floor
Lighting points : 7
Telephone points : 1
13 Amps power points : 3
Semi-detached (Type A, B, C):
Ground Floor
Lighting points : 8
13 Amps power points (3 phase electricity supply available) : 3
First Floor
Lighting points : 6
Telephone points : 1
13 Amps power points : 2
PLUMBING & SANITARY INSTALLATION
Ground Floor: 2 pedestal W.C. / 1 wash basin with tap / 1 urinal
1st Floor : 1 pedestal W.C. / 1 wash basin with tap / 1 urinal
*Type and colour of tiles are subject to availability
All items mentioned above are subject to amendments & substitutions as may be required by the relevant approving authorities or project architect.